The new Arena of the Colosseum
The new Colosseum Arena floor in Rome, will cover the 32,300-square-foot floor at a cost of $22.2 million, is expected to be completed by 2023.
If you didn't find what you were looking for, try a new search!
The new Colosseum Arena floor in Rome, will cover the 32,300-square-foot floor at a cost of $22.2 million, is expected to be completed by 2023.
Scientists are developing tiny sensors that can detect the presence of COVID-19 virus particles on screens, tables and other surfaces.
Exosonic supersonic aircraft maker, has partnered with the U.S. Air Force’s presidential and Executive Airlift Directorate (PE), to develop a supersonic aircraft for the USA President, that
Watch the insane engineering of the unique X-15, that set the world’s supersonic unofficial speed and altitude records of 4,520 mph (Mach 6.7) and 354,200 ft.
Scientists read minds, using new ultrasound technique that decode movement intentions.
Kelley Aerospace unveils Arrow supersonic combat drone that reaches speeds of Mach 2.1.
How are COVID-19 vaccines made? An expert explains…
Hyundai Motor Group unveils Tiger uncrewed Ultimate Mobility Vehicle (UMV) concept, a robotic car capable to operate on the surface of another planet.
Curtiss Motorcycles is adding ‘The One,’ another stunning electric bike to its line, starting production in Summer 2021.
Cake special edition Kalk AP electric motorbike has a top speed of 90km/h and a range of approximately 3 hours.